REPORTER: UCHE NDEKE
The Anambra State Government will not expend additional public resources on the repair of defective sections of newly constructed roads still covered by the contractors’ defect liability period.
This was stated by the Commissioner for Works and Infrastructure, Mr. Okey Ezeobi, while inspecting the Amawbia-Agulu road where some portions have deteriorated as a result of water-related challenges.
Mr. Ezeobi explained that the road has not been formally handed over to the state because the construction company remains responsible for correcting all defects identified within the stipulated liability period.
He noted that government policy requires newly constructed roads to undergo at least one full rainy season in order to expose any structural weaknesses that may not be visible immediately after construction.
According to him, the current rainy season is expected to reveal vulnerable sections so that the contractor can remedy the failures before the project is accepted by the state.
The Commissioner attributed part of the challenges on the corridor to the geological character of the area, pointing out that the road runs through a low-lying, flood-prone stretch where water accumulates and damages the asphalt surface.
He also identified human activities as a contributing factor, particularly the operations of horticultural businesses that obstruct natural water channels in order to retain water within their premises, thereby worsening drainage problems along the road.
Mr. Ezeobi stated that government is addressing the competing interests of businesses and road users by protecting drainage channels and the road’s right of way.
He appealed to residents to continue reporting road failures through social media, describing such public feedback as useful in helping the authorities and contractors identify and correct defects while the liability period is still active.
The Commissioner reaffirmed that the administration of Governor Chukwuma Soludo remains committed to ensuring that completed road projects meet the required quality standards before they are formally accepted by the state.
Correspondent Uche Ndeke reports that businesses along the corridor have been directed to maintain a minimum distance of three metres from the right of way.
